Southwest Colorado

Title
Click It or Ticket enforcement begins tomorrow
Nighttime striping operations to occur in the Durango area on Sunday
CDOT launches new seat belt campaign to coincide with Click It or Ticket enforcement beginning July 12
US 160 asphalt overlay job to begin west of South Fork in south-central Colorado
CDOT Offering Additional Grants to Promote Public Health
Fourth of July DUI enforcement period begins tomorrow
Bustang Service resumes Monday
Learn About the US 285 Safety Improvements Project
CDOT to begin resurfacing project on US 160/491 from Towaoc to Cortez  Speed limits to be strictly enforced
Can Do Colorado Community Challenge Launches to Promote a Healthy Reopening of the Economy
Colorado Department of Transportation releases key findings from two-year study aimed at reducing cannabis-involved traffic crashes and fatalities
US 550 Hermosa Creek bridge work north of Durango to resume June 15
CDOT's new campaign reminds drivers to drop the distraction as they head back out on the roads
231 impaired drivers arrested during Memorial Day enforcement period
Highway improvements to begin on CO 17 in Alamosa and Saguache Counties
PROJECT OPERATIONS ALERT: Re-striping operations throughout southwest & south-central Colorado to start June 1
Work to continue at 1111 Camino del Rio, near Town Plaza in Durango
Memorial Day DUI enforcement period kicks off Friday
Less Traffic expected for Memorial Day Weekend
U.S. 550 Hermosa Creek Bridge work postponed
CDOT adopts emergency rules allowing food trucks to obtain permits to serve customers at highway rest areas
CDOT Urges Motorists to Watch for Motorcyclists During Motorcycle Safety Awareness Month in May
Highway 3 in Durango set for week-long closure
Highway 3 in Durango set for four day closure
CDOT and DNR remind people to stay local, limit travel this weekend
US 24 Johnson Village chip seal treatment to begin May 8
Colorado Byways Receiving National Attention
Repair work to begin on U.S. 550 Hermosa Creek Bridge
Rumble strip work starts in southwest and south-central Colorado
Emergency repairs underway in the Eisenhower-Johnson Memorial Tunnel Repaving project to follow