Exhibit A - Standard Special Provisions

SECTION 101- FALSEWORK, FORMWORK AND SHORING 

SECTION 101- SAFETY CRITICAL WORK 

SECTIONS 101, 107, AND 208 - WATER QUALITY CONTROL 

SECTION 105 - CONFORMITY TO THE CONTRACT 

SECTION 105 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT 

SECTIONS 105 AND 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS) 

SECTION 105 - CONFORMITY TO THE CONTRACT OF
SUPERPAVE PERFORMANCE GRADED BINDERS
 

SECTIONS 105, 202, 401, 406 and 601 - HOT MIX ASPHALT PAVEMENT ROADWAY SMOOTHNESS (HIGH SPEED PROFILER) 

SECTION 105 - VIOLATION OF WORKING TIME LIMITATION 

SECTION 106 - CERTIFICATES OF COMPLIANCE AND CERTIFIED TEST REPORTS 

SECTION 106 - HOT MIX ASPHALT TEST RESULT VERIFICATION AND DISPUTE RESOLUTION 

SECTION 106 - HOT MIX ASPHALT - VERIFICATION TESTING 

SECTION 106 - REPORTING AND RECORD KEEPING 

SECTION 106 - SAMPLING AND TESTING OF HOT MIX ASPHALT
(GRADATION ACCEPTANCE)
 

SECTION 106 - SAMPLING AND TESTING OF PORTLAND CEMENT CONCRETE PAVEMENT 

SECTION 203 - EMBANKMENT 

SECTION 206 - SHORING 

SECTIONS 208, 420, 605 AND 712 - GEOSYNTHETICS AND GEOTEXTILES 

SECTION 208 - STORM DRAIN INLET PROTECTION 

SECTION 212 - SEEDING SEASONS 

SECTION 401 - COMPACTION OF HOT MIX ASPHALT 

SECTION 401 - COMPACTION PAVEMENT TEST SECTION (CTS) 

SECTION 401 - LONGITUDINAL JOINTS 

SECTION 401 - PROCESSING OF ASPHALT MIX DESIGN 

SECTION 401 - PLANT MIX PAVEMENTS 

SECTION 401 - RECLAIMED ASPHALT PAVEMENT 

SECTION 401 - TOLERANCES FOR HOT MIX ASPHALT 

SECTION 401 - TEMPERATURE SEGREGATION 

SECTION 412 - SAWCUT JOINTS 

SECTION 412 - PORTLAND CEMENT CONCRETE PAVEMENT CONSOLIDATING AND FINISHING 

SECTION 412 - PORTLAND CEMENT CONCRETE PAVEMENT ROADWAY SMOOTHNESS (HIGH SPEED PROFILER) 

SECTION 502 - PILING 

SECTIONS 601, 606, 608, 609, AND 618 - CONCRETE FINISHING 

SECTIONS 106 AND 601 - CONCRETE SAMPLING AND PUMPING 

SECTION 601- FORMS AND FALSEWORK 

SECTIONS 601 AND 701 - STRUCTURAL CONCRETE 

SECTIONS 613 & 715 - LIGHTING

SECTION 614 - TUBULAR STEEL SIGN SUPPORT 

SECTION 618 - ERECTION OF PRE-CAST CONCRETE MEMBERS 

SECTION 627 - PAVEMENT MARKING 

SECTIONS 627 AND 713 - PREFORMED PLASTIC PAVEMENT MARKING 

SECTION 630 - CONSTRUCTION ZONE TRAFFIC CONTROL 

SECTION 630 - METHOD OF HANDLING TRAFFIC 

SECTION 630 - NCHRP 350 REQUIREMENTS 

SECTION 702 - BITUMINOUS MATERIALS 

SECTION 703 - AGGREGATE FOR PLANT MIX PAVEMENTS 

SECTION 703 - AGGREGATE FOR STONE MATRIX ASPHALT 

SECTION 712 - HYDRATED LIME 

EMERGING SMALL BUSINESS PROGRAM 

RAILROAD INSURANCE