Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. 23rd Ln. Storm Sewer (US 50C to Everett Rd.)
  5. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • I-70 Wildlife Fence in Eagle County
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • CO 121 Signal Improvements in Jefferson County
  • I-70 Glenwood Canyon Material Flows
  • US 287 Surface Improvement Project
  • CO 2 - Colorado Boulevard Resurfacing Project
  • I-70 B and CO 141 B Resurfacing Project in Mesa County
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • US 40 Berthoud Pass Paving Project
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • US 50 & CO 71 Intersection Improvements
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 30/Gun Club Rd. Widening at Hampden
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • I-70 Vail Pass Eastbound Resurfacing
  • CO 88/Belleview Traffic Safety Project
  • Northeastern Colorado Pavement Marking & Rumble Strips
  • Arapahoe County Curb Ramps along CO 30/6th Avenue
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • Flood-Related Projects
    • 23rd Ln. Storm Sewer (US 50C to Everett Rd.)
      • Photo Gallery
        • 23rd Storm Drain Work 2.JPG
        • 23rd Storm Drain Work 1.JPG
Photo Gallery https://www.codot.gov/projects/archived-project-sites/23rd-ln-storm-sewer-us-50c-to-everett-rd/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

23rd Storm Drain Work 2.JPG thumbnail image 23rd Storm Drain Work 2.JPG
23rd Storm Drain Work 1.JPG thumbnail image 23rd Storm Drain Work 1.JPG

Project Photos

23rd Storm Sewer to US 50C to Everett Photo Gallery

Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo