Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. State Passenger and Freight Rail Plan
  5. Workshops/Open Houses Documents
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Denver Metro Bridge Safety Improvements
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Repaving and Structural Repairs in Walsenburg
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • State Passenger and Freight Rail Plan
      • Rail Plan - Final (March 2012)
      • Rail Vision for Colorado
      • Colorado State Rail Plan SOW Final
      • Steering Committee Members
      • Tasks - State Freight and Passenger Rail Plan
      • Resource Materials
      • Steering Committee Documents
      • Stakeholder Group Documents
      • Miscellaneous Documents
      • Frequently Asked Questions
      • Workshops/Open Houses Documents
        • Alamosa Workshop/Open House Meeting Notes – September 1, 2011
        • La Junta Workshop/Open House Meeting Notes – August 31, 2011
        • Grand Junction Workshop/Open House Meeting Notes – August 25, 2011
        • Denver Workshop/Open House Meeting Notes – August 23, 2011
        • Coal Industry Meeting Notes – August 22, 2011
        • Limon Workshop/Open House Meeting Notes – August 17, 2011
        • Akron Workshop/Open House Meeting Notes – August 15, 2011
        • Agricultural Meeting Notes – August 3 and 29, 2011
        • Open House Time and Locations
        • Comment Card for Workshops and Open Houses
        • Open House One Page Summary
        • Open House Display Boards
      • Draft Project List
      • Final Colorado State Freight and Passenger Rail Plan
      • 2012 Colorado State Freight and Passenger Rail Plan Executive Summary
      • 2012 Colorado State Freight and Passenger Rail Plan Appendix A (Outreach Plan)
Workshops/Open Houses Documents https://www.codot.gov/projects/archived-project-sites/PassengerFreightRailPlan/StateRailPlan-Workshops_OpenHouses_Docs https://www.codot.gov/@@site-logo/siteLogo.png

Workshops/Open Houses Documents

Alamosa Workshop/Open House Meeting Notes – September 1, 2011
La Junta Workshop/Open House Meeting Notes – August 31, 2011
Grand Junction Workshop/Open House Meeting Notes – August 25, 2011
Denver Workshop/Open House Meeting Notes – August 23, 2011
Coal Industry Meeting Notes – August 22, 2011
Limon Workshop/Open House Meeting Notes – August 17, 2011
Akron Workshop/Open House Meeting Notes – August 15, 2011
Agricultural Meeting Notes – August 3 and 29, 2011
Open House Time and Locations
Comment Card for Workshops and Open Houses
Open House One Page Summary
Open House Display Boards

Contacts

Sharon Terranova
2829 W Howard Place
Denver, CO 80204

303-757-9753
[email protected]

Freight & Passenger Rail Survey

Door to Door: How Do You Think Colorado Should Move Products and People?

As a part of the development of the Multimodal Freight Plan and State Freight and Passenger Rail plans, CDOT is interested in your opinions about how people and products move around our state. Let us know your thoughts by completing this short survey. Your insights are critical to helping CDOT respond to the needs of businesses and residents and to make Colorado’s economy competitive and our transportation system freight friendly. The information you provide will be used directly in shaping priorities and issues within CDOT’s plans. 

CDOT values your opinion!

Take the survey.

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo