ARRA Project Files

Pueblo Eastern Gateway Landscape

Landscaping and irrigation installation for the Eastern Gateway Landscape project located at the intersection of US 50B and SH 47.

US 85 between Titan Road and Cook Ranch

Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders.

CO 13 at Rio Blanco Hill

Reconstructs five miles of CO 13 in asphalt, adds eight-foot shoulders and climbing and passing lanes. The improvements will enhance recreational bicycling in this area. This is the first phase of a larger project to improve CO 13 between Rifle and Meeker. Keywords: State Highways

I-25, US 36 and C-470

Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470.

I-70 at Palisade Interchange (#42)

Improves safety by widening the acceleration and deceleration lanes at this interchange. The improvements will upgrade the interchange to current design standards.