CO 113 Bridge Replacement

Work will begin in March 2019 and continue through July 2019 on CO 113 near Peetz, Colorado.

Specific improvements include:

  • Removal of a bridge and replacement with a concrete box culvert as well as shoulder widening and pavement overlay.