CO 121 Rehabilitation in Lakewood

Project Facts

  • Cost: $5.2 million
  • Contractor: Martin Marietta Materials
  • Timeline: March – December 2019
  • Location: CO 121 (Wadsworth Boulevard) between Hampden Avenue and US 6 in Lakewood

CO 121 Work Area Map.jpg
CO 121/Wadsworth Boulevard work area map

Crews on this project have repaired more than three miles of Wadsworth Boulevard (aka Colorado Highway 121) between Hampden Avenue and US Highway 6 in the City of Lakewood. Specific work included:

  • installing and replacing 81 concrete curb ramps to comply with the Americans With Disabilities Act;
  • resurfacing and patching;
  • adjusting manholes;
  • installing signs; and
  • restriping the highway.
ADA Ramps Before and After.jpg
ADA ramps before and after project work
MMM Team NIGHT PAVING CO121.JPG
Night paving on Wadsworth Blvd.