CO 138 Bridge Replacement, Paving & ADA Upgrades

Project Facts
- Cost: $2.3 million
- Contractor: Simon Contractors
- Timeline: May - October 2018
- Location: Work extends from mile points 50.6 to 54.4 on CO 138, with bridge work taking place around mile point 50.7
Starting Monday, May 21, crews on this project began replacing a bridge on Colorado Highway 138 in Ovid, Colorado, in Sedgwick County—just south of the Nebraska border.
Other work includes:
- paving the highway;
- upgrading curb ramps to comply with current Americans with Disabilities Act (ADA) standards; and
- grading channels near the bridge, and repairing erosion-prevention material (aka, riprap).