CO 92 and CO 133 Chip Seal

Project Facts

  • Cost: $2.8 million
  • Contractor: United Companies
  • Timeline: July - August 2019
  • Location: Four work zones:
    1. CO 92 from mile points (MP) 55 to 62
    2. CO 133 from MP 0 to 11.43
    3. CO 92 from MP 6.98 to 15.5
    4. CO 92 from MP 0.02 to 4.2

On Monday, July 15, crews nrgan applying protective material to several sections of Colorado Highway 92 in Montrose, Delta, and Gunnison counties, and a stretch of CO 133 in Delta County. Other work includes:

  • spraying liquid oil to the road to reinforce it, making it more flexible and durable (aka fog seal);
  • patching asphalt; and
  • adding pavement markings to the road.

This project is part of CDOT's "Whole System. Whole Safety." initiative, aimed at enhancing safety for the traveling public. Work was completed at the end of August 2019.


Benefits

  • Help preserve and repair the asphalt.
  • Create a smoother and safer surface for vehicles. 

Travel Impacts

  • No further traffic impacts
  • Work schedule/sequence:
    • CO 92 between mile points (MP) 55 and 62, west of Blue Mesa Reservoir
    • CO 133 between MP 0 and 11.43, east of Hotchkiss
    • CO 92 between MP 6.98 and 15.5, east of Delta
    • CO 92 between MP 0.02 and 4.2, east of Delta