CO 93 Improvements

Project Facts

  • Cost: $169,000

Project Team

  • Contractor(s): All Cowboy Erosion Control

In 2017, crews completed construction on Colorado Highway (CO) 93 between CO 170 (Eldorado Springs Drive) and CO 128.

Work included erosion-control work on this stretch of highway, which had been impacted by major storms, and steel pipe installation, rock check dams at 100-foot intervals, turf reinforcement and re-seeding the area to ensure proper drainage.