CO 116 Two Buttes Resurfacing

Project Facts

  • Cost: $8.8 million
  • Contractor: A&S Construction
  • Timeline: March - August 2020 
  • Location: CO 116 from the US 287 intersection through Two Buttes, then to the Colorado/Kansas State Line.

CO 116 Two Buttes .jpg

CO 116 Two Buttes Resurfacing Project Map

On March 26th, the Colorado Department of Transportation and A&S Construction will begin work on CO 116. The project limits will begin at the US 287 intersection, go through Two Buttes,
and end at the Colorado/Kansas State Line. 

This highway resurfacing project, from MP 0.0 through MP 32.3, will include a 1-inch leveling course over the existing surface and a 1.5-inch overlay. Other work items include:  replacing guardrail, replacing delineators, sign replacement, and at CR33 culvert improvements. This project will benefit the public by improving the roadway for better and safer driving conditions and is anticipated to be complete in August.