Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. CO 94 & Peyton Highway Intersection Improvements
  5. Photo Gallery
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 207 & CO 266 Resurfacing
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 138 Logan County Widening Project
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • CO 88/Belleview Traffic Safety Project
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 CCTV Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • I-25 Acceleration/Deceleration Lanes Fillmore Street to Garden of the Gods Road
  • CO 392 Weld County Safety Project
  • US 50B Drainage Improvements east of Swink
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • CO 94 & Peyton Highway Intersection Improvements
      • Photo Gallery
        • June 2020 CO 94 paving prep.JPG
        • June 2020 CO 94 looking east (3).JPG
        • July 2020 paving prep 1.jpg
        • July 2020 paving prep.jpg
        • August 2020 final CO 94 at Peyton Hwy looking west.jpeg
        • August 2020 final CO 94 at Peyton Hwy looking east.jpeg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/co94-peytonintersection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

June 2020 CO 94 paving prep.JPG thumbnail image June 2020 CO 94 paving prep.JPG
June 2020 CO 94 looking east (3).JPG thumbnail image June 2020 CO 94 looking east (3).JPG
July 2020 paving prep 1.jpg thumbnail image July 2020 paving prep 1.jpg
July 2020 paving prep.jpg thumbnail image July 2020 paving prep.jpg
August 2020 final CO 94 at Peyton Hwy looking west.jpeg thumbnail image August 2020 final CO 94 at Peyton Hwy looking west.jpeg
August 2020 final CO 94 at Peyton Hwy looking east.jpeg thumbnail image August 2020 final CO 94 at Peyton Hwy looking east.jpeg

Photo Gallery

CO 94 & Peyton Hwy.
Project Photos

Stay Informed

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo