Denver Metro Sign Structures
Project Facts
Project Team
- Contractor(s):
WL Construction
Crews replaced five overhead sign bridges and cantilever sign structures along I-25, I-70 and I-76 between late February and June 2017.
- First, crews constructed concrete supports for the new cantilever structures. Signs were replaced or reset on the new structures.
- Once the signs were placed, both northbound I-25 and westbound I-70 were closed overnight to remove the old sign bridges.
- Many of the affected signs were replaced with new signs that use "full-cube" prismatic reflective sheeting, which improves night visibility.
Sixteen signs were replaced or relocated.