You are here: Home Projects Archived Project Sites East Central Colorado ADA Curb Ramps Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/east-central-ada-curb-ramps/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews removing old ramps on CO 86 in Kiowa.jpg Crews removing concrete on CO 86 and Pawnee.jpg ramp and sidewalk upgrade Kiowa.jpg new sdewalk section and curb ramp curing Kiowa.jpg new curb ramp Kiowa.jpg Crews installing new ramps and sections of sidewalk in Kiowa.jpg Jaedon curb and sidewalk Kiowa.jpg new replaced ramps and portion of sidewalk Kiowa.jpg crews pouring concrete new ramps Kiowa (1).jpg covered sidewalk and ramps for curing (1).jpg Crews laying formwork for new curb ramps in Kiowa (1).jpg new ramp at CO 86 and Pine Elizabeth.jpg Curb and gutter work CO 86 and Elbert Town of Elizabeth.jpg Crews removing sidewalk and ramps CO 86 and Pine Town of Elizabeth.jpg Ramp replacement in progress CO 86 at Elbert.jpg Curb removal at CO 86 and Banner.jpg CO 86 and Pine Town of Elizabeth.jpg Ramp replacement in progress CO 86 at Elbert (1).jpg Curb removal at CO 86 and Banner (1).jpg CO 86 and Pine Town of Elizabeth (1).jpg Ready to pour CO 86 and Main.jpg Pouring CO 86 at Main SW.jpg Final portion of curb and gutter poured on CO 86 at Banner Elizabeth (1).jpg Curb and gutter pour CO 86 in Elizabeth.jpg midblock concrete sidewalk pour Elizabeth.jpg Crews smoothing concrete after pour CO 86 at SW corner of Main.jpg Crews replacing curb ramp CO 86 at Main.jpg Crews pouring concrete ramps Elizabeth.jpg collage LP.jpg new ramp on CO 86 at Elbert Elizabeth.jpg Updated ramp and sidewalk at CO 86 and Garland.jpg Ramp upgrade in progress CO 86 at CR 17 Elizabeth.jpg NW island renewed with ramps and sidewalk CO 86 at CR 17.jpg CO 86 at Elbert.jpg US 24 and B Ave Limon.jpg US 24 and B Ave NE Limon.jpg US 24 and C Ave Limon.jpg Portable concrete washouts.jpg US 24 and C Ave NE Limon.jpg US 24 and C Ave NW Limon.jpg collage US 24 and D Ave.jpg US 24 and G Avenue.jpg US 24 and G Avenue Limon.jpg Crew working at US 24 and NE corner of D Avenue in Limon.jpg Crews replacing ramps US 24 and D St Limon.jpg Crews pouring concrete US 24 D Ave SE.jpg Crews pouring concrete Limon.jpg Crews at US 24 and D Ave SE Limon.jpg New paving and ramp work underway US 24 and B Ave SE Limon.jpg Curb ramp work underway at US 24 Spur and 6th in Limon.jpg Crews finishing new curb ramp replacement on US 24 and D Ave in Limon.jpg Crews replacing ramps on CO 71 at SE Corner of 4th Street in Limon (1).jpg Crews replacing ramps and paving sidewalk at US 40 and 3rd Avenue NW in the Town of Hugo.jpg Paving crews US 40 at 3rd Avenue Hugo.jpg Crews paving and adding new curb ramps US 40 and 3rd Ave Hugo.jpg Crews replacing curb ramp on US 40 at West Street in Kit Carson.jpg Crews replacing curb ramp on US 40 at 5th Avenue in Town of Hugo.jpg Crews replacing curb ramp on US 40 at Grand Street in Kit Carson.jpg Crews laying new concrete and upgrading curb ramp at US 40 and Welton in Kit Carson.jpg Ramp and sidewalk upgrades underway at N 1st St in Cheyenne Wells.jpg form work in place for curb ramps Cheyenne Wells.jpg form work Cheyenne Wells.jpg concrete work underway Cheyenne Wells.jpg checking concrete-13th Burlington.jpg digging out curb Burlington.jpg crews laying concrete on Rose Ave at 13th Burlington.jpg checking concrete-13th Burlington (1).jpg Pouring concrete-13th Burlington.jpg 8th and Lowell 2 12-17-21.jpg 8th and Doneland north side of street.jpg 8th and Donelan south side of street 12-17-21.jpg Finished curb on east end of the 13th street intersection.jpg Finished curb on 13th Street.jpg Finished curb on 13th Street 2 12-17-21.jpg Formwork in place for new ramps at 8th and Martin Burlington.jpg Crews performing concrete fill at 8th and Lowell.jpg Concrete pour work underway at 8th and Lowell.jpg Concrete pour underway 8th and Lowell.jpg Crews performing concrete work at 8th and Lowell in Burlington.jpg Concrete pour underway 8th and Lowell (1).jpg Crews performing concrete fill at 8th and Lowell (1).jpg Finished curb on 13th Street Burlington (1).jpg Northeast_corner_of_Rose_and_14th_(1)[1].jpg 8th_and_Senter_(1)[1].jpg 17th_and_Rose_Ave._(1)[1].jpg 18th and Rose Ave, both northwest corner and southwest corner (1).jpg Revised Cheyenne Wells 1.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/east-central-ada-curb-ramps/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews removing old ramps on CO 86 in Kiowa.jpg Crews removing concrete on CO 86 and Pawnee.jpg ramp and sidewalk upgrade Kiowa.jpg new sdewalk section and curb ramp curing Kiowa.jpg new curb ramp Kiowa.jpg Crews installing new ramps and sections of sidewalk in Kiowa.jpg Jaedon curb and sidewalk Kiowa.jpg new replaced ramps and portion of sidewalk Kiowa.jpg crews pouring concrete new ramps Kiowa (1).jpg covered sidewalk and ramps for curing (1).jpg Crews laying formwork for new curb ramps in Kiowa (1).jpg new ramp at CO 86 and Pine Elizabeth.jpg Curb and gutter work CO 86 and Elbert Town of Elizabeth.jpg Crews removing sidewalk and ramps CO 86 and Pine Town of Elizabeth.jpg Ramp replacement in progress CO 86 at Elbert.jpg Curb removal at CO 86 and Banner.jpg CO 86 and Pine Town of Elizabeth.jpg Ramp replacement in progress CO 86 at Elbert (1).jpg Curb removal at CO 86 and Banner (1).jpg CO 86 and Pine Town of Elizabeth (1).jpg Ready to pour CO 86 and Main.jpg Pouring CO 86 at Main SW.jpg Final portion of curb and gutter poured on CO 86 at Banner Elizabeth (1).jpg Curb and gutter pour CO 86 in Elizabeth.jpg midblock concrete sidewalk pour Elizabeth.jpg Crews smoothing concrete after pour CO 86 at SW corner of Main.jpg Crews replacing curb ramp CO 86 at Main.jpg Crews pouring concrete ramps Elizabeth.jpg collage LP.jpg new ramp on CO 86 at Elbert Elizabeth.jpg Updated ramp and sidewalk at CO 86 and Garland.jpg Ramp upgrade in progress CO 86 at CR 17 Elizabeth.jpg NW island renewed with ramps and sidewalk CO 86 at CR 17.jpg CO 86 at Elbert.jpg US 24 and B Ave Limon.jpg US 24 and B Ave NE Limon.jpg US 24 and C Ave Limon.jpg Portable concrete washouts.jpg US 24 and C Ave NE Limon.jpg US 24 and C Ave NW Limon.jpg collage US 24 and D Ave.jpg US 24 and G Avenue.jpg US 24 and G Avenue Limon.jpg Crew working at US 24 and NE corner of D Avenue in Limon.jpg Crews replacing ramps US 24 and D St Limon.jpg Crews pouring concrete US 24 D Ave SE.jpg Crews pouring concrete Limon.jpg Crews at US 24 and D Ave SE Limon.jpg New paving and ramp work underway US 24 and B Ave SE Limon.jpg Curb ramp work underway at US 24 Spur and 6th in Limon.jpg Crews finishing new curb ramp replacement on US 24 and D Ave in Limon.jpg Crews replacing ramps on CO 71 at SE Corner of 4th Street in Limon (1).jpg Crews replacing ramps and paving sidewalk at US 40 and 3rd Avenue NW in the Town of Hugo.jpg Paving crews US 40 at 3rd Avenue Hugo.jpg Crews paving and adding new curb ramps US 40 and 3rd Ave Hugo.jpg Crews replacing curb ramp on US 40 at West Street in Kit Carson.jpg Crews replacing curb ramp on US 40 at 5th Avenue in Town of Hugo.jpg Crews replacing curb ramp on US 40 at Grand Street in Kit Carson.jpg Crews laying new concrete and upgrading curb ramp at US 40 and Welton in Kit Carson.jpg Ramp and sidewalk upgrades underway at N 1st St in Cheyenne Wells.jpg form work in place for curb ramps Cheyenne Wells.jpg form work Cheyenne Wells.jpg concrete work underway Cheyenne Wells.jpg checking concrete-13th Burlington.jpg digging out curb Burlington.jpg crews laying concrete on Rose Ave at 13th Burlington.jpg checking concrete-13th Burlington (1).jpg Pouring concrete-13th Burlington.jpg 8th and Lowell 2 12-17-21.jpg 8th and Doneland north side of street.jpg 8th and Donelan south side of street 12-17-21.jpg Finished curb on east end of the 13th street intersection.jpg Finished curb on 13th Street.jpg Finished curb on 13th Street 2 12-17-21.jpg Formwork in place for new ramps at 8th and Martin Burlington.jpg Crews performing concrete fill at 8th and Lowell.jpg Concrete pour work underway at 8th and Lowell.jpg Concrete pour underway 8th and Lowell.jpg Crews performing concrete work at 8th and Lowell in Burlington.jpg Concrete pour underway 8th and Lowell (1).jpg Crews performing concrete fill at 8th and Lowell (1).jpg Finished curb on 13th Street Burlington (1).jpg Northeast_corner_of_Rose_and_14th_(1)[1].jpg 8th_and_Senter_(1)[1].jpg 17th_and_Rose_Ave._(1)[1].jpg 18th and Rose Ave, both northwest corner and southwest corner (1).jpg Revised Cheyenne Wells 1.jpg