You are here: Home Projects Archived Project Sites I-25 Bridge Replacement at Butte Creek Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/i-25-butte-creek-bridge-replacement/project-photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Northbound I-25 Butte Creek Northbound and Southbound Bridges at I-25 and Butte Creek SB Bridge at I-25 Butte Creek north detour pavement schematic detour Butte detour photo I-25 Butte detour schema Crews Prepare for Bridge Rail Removal Closeup of bridge demolition crew prepping for southbound bridge removal CR103 remaining piers of bridge at I25 and Butte Creek Piers I25 Butte Creek post removal of superstructure deck removed crews removing girders complete removal of girder Piers I25 Butte Creek post removal of superstructure CR103 westbound showing remaining piers of demolished southbound bridge at I25 and Butte Creek view of southbound detour pavement with barrier from frontage road Exit 59 guardrail end caps southbound I-25 Butte Creek detour pavement and barrier 3 1 19 Columns for new bridge 3 1 19 Widening exit 59 3 1 19 Traffic light CR 103 Exit 59 cr 103 shows foundation of new bridge new southbound bridge substructure placement of girders girders lowered onto new southbound bridge superstructure New southbound bridge span Rebar southbound bridge Wide shot of concrete deck pour onto new southbound bridge New southbound bridge from Exit 59 I-25 Butte Creek Closeup new bridge at I-25 Exit 59 over CR 103 Wide shot of deck pour traffic configuration South view half deck pour North view half deck pour Closeup north view deck pour deck new southbound bridge northbound detour pavement under construction superstructure new southbound bridge wide shot new southbound bridge new southbound bridge over CR 103 closeup of new southbound bridge underside new southbound bridge view of new bridge's substructure view of new southbound bridge from CR 103 new southbound bridge Exit 59 almost complete New southbound bridge from CR 103 kc View of new southbound bridge KC southeast view of new southbound bridge KC Closeup of northbound bridge structural condition Condition of northbound bridge to be replaced Northbound bridge current condition Northbound detour configuration CR 103 was closed during demolition of the northbound bridge Crews remove remains of the northbound bridge Removal of northbound bridge credit Doug Chatelain CR 103 closed to through traffic Near view of southbound bridge with columns for new northbound bridge Covered columns for new northbound bridge Closeup girder placement span one northbound bridge Crews unloading girders for placement northbound bridge Girder placement span one northbound bridge East view of girder placement from CR 103 Wide view girder placement northbound bridge West view new superstructure northbound bridge underside view new northbound bridge girders wide view new span northbound bridge Approach anchor slab northbound bridge.jpg Northwest view sleeper slab placement.jpg closeup of new southbound bridge closeup wide view northbound bridge.jpg closeup northbound bridge under construction.jpg southeast view of northbound bridge close up.jpg wide northwest view northbound bridge.jpg West view of final northbound bridge deck pour in progress.jpg North drone view of deck pour in progress.jpg Drone view of final deck pour.jpg Closeup crews performing northbound bridge deck pour.jpg southeast view of northbound bridge close up (1).jpg southeast view of northbound bridge close up (2).jpg closeup northbound bridge complete.jpg New northeast view northbound bridge.jpg span northbound bridge over CR 103.jpg wide shot northbound bridge.jpg New northeast view northbound bridge (1).jpg finished northbound bridge Exit 59 over CR 103.jpg lane restoration at Exit 59.jpg finished northbound bridge Exit 59 over CR 103 (1).jpg Wide view of south and northbound traffic at Exit 59.jpg wide shot sb bridge.jpg wide shot nb bridge dec 5 2020.jpg east view both bridges 12 5 2020.jpg closeup new northbound bridge over 103 12 5 2020.jpg view of northbound I-25 from south bridge.jpg under nb bridge.jpg safety endcaps guardrail and new striping.jpg new striping nb 25.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/i-25-butte-creek-bridge-replacement/project-photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Northbound I-25 Butte Creek Northbound and Southbound Bridges at I-25 and Butte Creek SB Bridge at I-25 Butte Creek north detour pavement schematic detour Butte detour photo I-25 Butte detour schema Crews Prepare for Bridge Rail Removal Closeup of bridge demolition crew prepping for southbound bridge removal CR103 remaining piers of bridge at I25 and Butte Creek Piers I25 Butte Creek post removal of superstructure deck removed crews removing girders complete removal of girder Piers I25 Butte Creek post removal of superstructure CR103 westbound showing remaining piers of demolished southbound bridge at I25 and Butte Creek view of southbound detour pavement with barrier from frontage road Exit 59 guardrail end caps southbound I-25 Butte Creek detour pavement and barrier 3 1 19 Columns for new bridge 3 1 19 Widening exit 59 3 1 19 Traffic light CR 103 Exit 59 cr 103 shows foundation of new bridge new southbound bridge substructure placement of girders girders lowered onto new southbound bridge superstructure New southbound bridge span Rebar southbound bridge Wide shot of concrete deck pour onto new southbound bridge New southbound bridge from Exit 59 I-25 Butte Creek Closeup new bridge at I-25 Exit 59 over CR 103 Wide shot of deck pour traffic configuration South view half deck pour North view half deck pour Closeup north view deck pour deck new southbound bridge northbound detour pavement under construction superstructure new southbound bridge wide shot new southbound bridge new southbound bridge over CR 103 closeup of new southbound bridge underside new southbound bridge view of new bridge's substructure view of new southbound bridge from CR 103 new southbound bridge Exit 59 almost complete New southbound bridge from CR 103 kc View of new southbound bridge KC southeast view of new southbound bridge KC Closeup of northbound bridge structural condition Condition of northbound bridge to be replaced Northbound bridge current condition Northbound detour configuration CR 103 was closed during demolition of the northbound bridge Crews remove remains of the northbound bridge Removal of northbound bridge credit Doug Chatelain CR 103 closed to through traffic Near view of southbound bridge with columns for new northbound bridge Covered columns for new northbound bridge Closeup girder placement span one northbound bridge Crews unloading girders for placement northbound bridge Girder placement span one northbound bridge East view of girder placement from CR 103 Wide view girder placement northbound bridge West view new superstructure northbound bridge underside view new northbound bridge girders wide view new span northbound bridge Approach anchor slab northbound bridge.jpg Northwest view sleeper slab placement.jpg closeup of new southbound bridge closeup wide view northbound bridge.jpg closeup northbound bridge under construction.jpg southeast view of northbound bridge close up.jpg wide northwest view northbound bridge.jpg West view of final northbound bridge deck pour in progress.jpg North drone view of deck pour in progress.jpg Drone view of final deck pour.jpg Closeup crews performing northbound bridge deck pour.jpg southeast view of northbound bridge close up (1).jpg southeast view of northbound bridge close up (2).jpg closeup northbound bridge complete.jpg New northeast view northbound bridge.jpg span northbound bridge over CR 103.jpg wide shot northbound bridge.jpg New northeast view northbound bridge (1).jpg finished northbound bridge Exit 59 over CR 103.jpg lane restoration at Exit 59.jpg finished northbound bridge Exit 59 over CR 103 (1).jpg Wide view of south and northbound traffic at Exit 59.jpg wide shot sb bridge.jpg wide shot nb bridge dec 5 2020.jpg east view both bridges 12 5 2020.jpg closeup new northbound bridge over 103 12 5 2020.jpg view of northbound I-25 from south bridge.jpg under nb bridge.jpg safety endcaps guardrail and new striping.jpg new striping nb 25.jpg