Traffic Impacts - Week of Aug. 27 to Sept. 2

 

Please be advised of the following travel advisory, lane closures and planned work for next week for the I-70 over 32nd Avenue Bridge Replacement project in Jefferson County.

*****
Travel Advisory - Overnight Traffic Shift - Eastbound I-70 - Aug. 30
  • A traffic shift on eastbound I-70 within the project limits will be implemented during overnight hours on Aug. 30 to restore traffic lanes to their original alignment
  • Work during the implementation of the shift includes setting temporary barrier, restriping the lanes, and realigning traffic 
  • Motorists can expect double lane closures and short delays on eastbound I-70 during the shift
  • These closures and delays will be in place between 10 p.m. and 6 a.m.
  • The scheduled date of Aug. 30 is weather dependent, with a backup date of Aug. 31
  • Once the overnight shift is implemented, traffic will be in its final configuration
  • Three lanes of traffic will be maintained in each direction of I-70 through the work zone
  • No impacts to westbound I-70 or 32nd Ave. under I-70 are expected during the shift
Work includes moving barrier, restriping, and implementing a traffic shift.
*****
Sunday, Aug. 27 to Tuesday, Aug. 29 - eastbound I-70 - intermittent overnight lane closures 
  • Single right lane closures may exist on eastbound I-70 during overnight hours, as needed
  • The closures will be in place from approx. 7 p.m. to 6 a.m. Sunday to Tuesday
  • These closures are weather and work dependent and subject to change
Work includes milling, paving, repairing guardrail, misc. median work, and preparing for the traffic shift on eastbound I-70.
*****
Monday, Aug. 28 to Friday, Sept. 1 - 32nd Ave under I-70 - lane closures 
  • Intermittent single lane closures will exist during daytime hours in both directions of 32nd Ave under I-70 
  • The closures will be in place from approx. 8 a.m. to 5 p.m. Monday to Thursday, and 8 a.m. to noon on Friday, Sept. 1
  • Occasional overnight lane closures may be taken in both directions of 32nd Ave from 8 p.m. to 5 a.m., as needed
  • Single right lane closures may also exist on southbound Youngfield St through the work zone, as needed
  • Sidewalk access is limited
  • All schedules are weather and supply dependent and subject to change
Work includes milling, paving, misc. median work, and repairing guardrail.
Wide view of the newly constructed eastbound I-70 bridge over 32nd Ave.
Photo Estate Media.

Nearby Project Impacts


 I-70 over Ward Road Bridge Replacement
  • A full overnight closure of Ward Rd/CO 72 will be in place from 11 p.m. to 6 a.m. on Aug. 30 for a bridge deck pour
  • A detour route will exist (W. 44th Ave to Youngfield to Clear Creek Pkwy)
  • The westbound I-70 ramps will remain open during the deck pour
  • Single overnight lane closures in both directions of I-70 will exist during overnight hours on Aug 30 from 10 p.m. to 6 am.
  • Various daytime lane closures will be taken in both directions of Ward Road/CO 72 under the I-70 bridges Monday to Friday
  • Some overnight lane closures will exist during the week of Aug. 27 to Sept. 2 for the overnight bridge deck pour
  • Overnight lane closures will be in place on I-70 within the project limits
  • The daily closures will exist from 7 a.m. to 6 p.m. and overnight from 7 p.m. to 6 a.m.
  • All construction schedules are weather and supply dependent and subject to change
Work includes constructing detour pavement, reinforcing the bridge deck, and pouring the bridge deck.

Stay Connected!

 
Webpage: https://www.codot.gov/projects/i70-bridges-over-32nd-avenue
Hotline303.960.2825
Email:
i7032avebridges@comcast.net
Sign up for Text Alerts: text bridges to 8886650058
 
Road ConditionsCOtrip.org 
COtrip Planner App
bit.ly/COtripapp
Project Travel Alertsbit.ly/COnewsalerts
Lane Closuresbit.ly/laneclosures
decorative image
@ColoradoDOT on Facebook
@ColoradoDOT on Twitter
@ColoradoDOT on Instagram
@ColoradoDOT on YouTube
@ColoradoDOT on Flickr
Copyright © 2023 Colorado Department of Transportation All rights reserved.

Our mailing address is:

Colorado Department of Transportation
2829 W Howard Place
Denver CO 80204

You are receiving this email because you requested information regarding construction updates for the <Project Name>. Update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Colorado Department of Transportation · 2829 West Howard Place · Denver, CO 80204 · USA