I-70 over 32nd Ave Bridge Replacement

Weekly Traffic Impacts & Work Update


Traffic Impacts - Week of Oct. 8 to Oct. 14

 

Please be advised of the following lane closures, restrictions and planned work for next week for the I-70 over 32nd Avenue Bridge Replacement project in Jefferson County.

*****

Sunday, Oct. 8 to Thursday, Oct. 12 - Westbound I-70 - nightly single to double lane closures 

  • Single lane closures will be taken on westbound I-70 from 7 p.m. to 9 p.m. nightly Sunday to Thursday
  • These single lanes will switch to double lane closures at 9 p.m. and last until approx. 6 a.m. nightly
  • The project limits on I-70 extend from Mile Point 263 to MP 265
  • All schedules are weather and supply dependent and subject to change
Work includes SMA paving, adding temporary striping, installing fiber conduit and pull boxes, guardrail patching, and final grading.
*****

Sunday, Oct. 8 to Friday, Oct. 13 - 32nd Ave under I-70 - overnight (Sunday) and daily lane closures

  • A double overnight lane closure will be in place in both directions of 32nd Ave from 8 p.m. on Sunday, Oct. 8 through 5 a.m. on Monday, Oct. 9
  • Double lane closures will be in place from 8 a.m. to 3 p.m. Monday to Friday in both directions of 32nd Ave 
  • Single lane closures will exist before 8 a.m. or after 3 p.m. Monday to Friday, as needed
  • Some Saturday work is expected
  • The south sidewalk on 32nd Ave is temporarily closed
  • Sidewalk access is limited to the north side of 32nd Ave
  • Caution is advised
  • All schedules are weather and supply dependent and subject to change
Work includes removing barrier, concrete work, striping, and median paving.
*****
Wide and closeup views of new I-70 bridge structures over 32nd Ave.
Aerial photography by John Klippel Photography.

Nearby Project Impacts


 I-70 over Ward Road Bridge Replacement
  • Periodic overnight (7 p.m. to 6 a.m.) or early morning (4 a.m. to 6 a.m.) single lane closures will exist in both directions of I-70 within the project limits, as needed
  • The project limits on I-70 extend from Mile Point 265 to MP 266.5
  • Various daytime and some overnight lane closures will be taken in both directions of Ward Road/CO 72 under the I-70 bridges Monday to Friday
  • The daily closures on Ward Road will exist from 7 a.m. to 6 p.m. and overnight from 7 p.m. to 6 a.m.
  • All construction schedules are weather and supply dependent and subject to change
Work includes constructing detour pavement, installing fiber lines, paving the detour and SMA paving the bridge deck.

Stay Connected!

 
Webpage: https://www.codot.gov/projects/i70-bridges-over-32nd-avenue
Hotline303.960.2825
Email:
i7032avebridges@comcast.net
Sign up for Text Alerts: text bridges to 8886650058
 
Road ConditionsCOtrip.org 
COtrip Planner App
bit.ly/COtripapp
Project Travel Alertsbit.ly/COnewsalerts
Lane Closuresbit.ly/laneclosures
decorative image
@ColoradoDOT on Facebook
@ColoradoDOT on Twitter
@ColoradoDOT on Instagram
@ColoradoDOT on YouTube
@ColoradoDOT on Flickr
Copyright © 2023 Colorado Department of Transportation All rights reserved.

Our mailing address is:

Colorado Department of Transportation
2829 W Howard Place
Denver CO 80204

You are receiving this email because you requested information regarding construction updates for the <Project Name>. Update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
Colorado Department of Transportation · 2829 West Howard Place · Denver, CO 80204 · USA