Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. North I-25 EIS
  5. North I-25 ROD 2
Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 139 Douglas Pass Resurfacing Project
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • CO 392 & CR 55 Turn Improvements
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Stencil Project in Teller & El Paso Counties
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • US 85 & Meadows Parkway Culvert Rehabilitation
  • T-Rex Narrows Bridge Preventative Maintenance
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • North I-25 EIS
      • Records of Decision
      • North I-25 Commuter Rail Update
      • Final EIS
      • DEIS - Draft Environmental Impact Statement
      • Corridor History
      • Public Involvement
      • Project Team
      • Transit Technologies/Highway Options
      • Latest News / Media Room
      • RCC / TAC
      • Transit and Rail Program
      • North I-25 ROD 2
        • North I-25 ROD 2 Sept. 2014 Presentation
        • A Transportation TM (I25 ROD2 SH7) wAppendix 092815FINAL
        • B Air Quality TR (I25 ROD2 SH7) wAppendices 092815FINAL
        • C Noise Report (I25 ROD2 SH7) wAppendices 092815FINAL
        • D Historic Report (I25 ROD2 SH7) wAppendix 092815FINAL
        • E Section 4f (I25 ROD2 SH7) wAppendices 092815FINAL
        • F LandUse Socio EJ TM (I25 ROD2 SH7) wAppendix 092815FINAL
        • H Other Resources TM (I25 ROD2 SH7) 092815FINAL
        • I CDOT Mitigation Tracking Form 092815FINAL
        • J Public Involvement
        • ROD2 North I 25 (SH 7) Sept 2015 FINAL
North I-25 ROD 2 (ROD-Record of Decision) https://www.codot.gov/projects/archived-project-sites/north-i-25-eis/north-i-25-rod-2-1 https://www.codot.gov/@@site-logo/siteLogo.png

North I-25 ROD 2

(ROD-Record of Decision)
North I-25 ROD 2 Sept. 2014 Presentation
A Transportation TM (I25 ROD2 SH7) wAppendix 092815FINAL
B Air Quality TR (I25 ROD2 SH7) wAppendices 092815FINAL
C Noise Report (I25 ROD2 SH7) wAppendices 092815FINAL
D Historic Report (I25 ROD2 SH7) wAppendix 092815FINAL
E Section 4f (I25 ROD2 SH7) wAppendices 092815FINAL
F LandUse Socio EJ TM (I25 ROD2 SH7) wAppendix 092815FINAL
H Other Resources TM (I25 ROD2 SH7) 092815FINAL
I CDOT Mitigation Tracking Form 092815FINAL
J Public Involvement
ROD2 North I 25 (SH 7) Sept 2015 FINAL
G_Mesa_Addendum_092815FINAL

Tags:
  • North I-25 EIS
  • Northwestern (Region 3)
Contact Us
  • Carol Parr
    Project Manager
    NEPA Program & Environmental Unit Manager
    CDOT Region 4
    970-350-2170
    Email Carol.

  • Jared Fiel
    Communications Manager
    Email Jared.
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo