Stakeholder Working Group Meeting, April 10, 2014

This Stakeholder Working Group (SWG) workshop was the second meeting held to discuss more detailed design for the Grand Avenue Bridge on the proposed Grand Avenue Bridge; new pedestrian bridge; and supporting changes to Grand Avenue, 7th Street, 8th Street, and the area on the north side of I-70.

The design elements input process endorsed by the Project Leadership Team included the actions needed to make recommendations on specific design details over two scheduled SWG workshops. The first meeting was held on March 13, 2014, where the project team presented initial concepts. At this second meeting held on April 10, 2014, the project team presented changes they had made to develop refined options, asked for the participants’ concurrence with the options presented, and presented some new concepts for consideration.

A summary of the meeting and the presentation file used by the project team are provided at the links below.

Stakeholder Working Group Summary April 10, 2014

Stakeholder Working Group Presentation April 10, 2014