US 160 Cortez & Durango Concrete Repairs
Project Complete!
This preventative maintenance project includes:
- Replacing and patching damaged concrete pavement
- Restoring the surface skid resistance and roadway smoothness through a process called diamond grinding
- Re-sealing joints/cracks
- Cross-stitching
- Wheelchair accessible ramps
- Inlaid striping
Project Facts
- Cost: $5.02 Million
- Contractor: Interstate Improvement
- Timeline: May - October 2021
- Location: US 160 through Cortez & US 160 west of Durango (MP 81.3 to 83.3); also US 491 in south Cortez (MP 26.2 to 27.36)