US 34 Bridge Replacement over Colorado River

Project Facts

  • Cost: $3.8 million
  • Contractor: Structures, Inc.
  • Timeline: April - October 2019
  • Location: a bridge on US 34 south of Grand Lake in Grand County

From April through October 2019, crews on this project will replace a structurally deficient bridge on US Highway 34 over the Colorado River, from mile points 10 to 14 in Grand County.

Other work includes improving grading and drainage, and paving.