US 385 Cheyenne Wells

Project Facts

  • Cost: $2.1 million
  • Contractor: Jalisco International
  • Timeline: August - Fall 2019

To improve truck-traffic flow on US 385 (S. 2nd Street) in the Town of Cheyenne Wells, CDOT reconstructed two 90-degree curves from W. 1st Street (MP 150.73) to E. 5th Street (MP 150.33).

Other work included:

  • installing a sidewalk along US 385 from W. 3rd Street to E. 4th Street to enhance pedestrian access; and
  • making drainage improvements to reduce the potential of ponding water on the road.