US 40 Steamboat West

Project Facts

  • Average Annual Daily Traffic: 11,000
  • Timeframe: May 1, 2017 - Aug. 1, 2018 
  • Total Lane Miles: 9.1

Project Team

  • Contractor(s): Flatiron Construction Corp.

From May 2017 through summer 2018, crews on this project improved safety and mobility on US 40 from Steamboat Springs west. 

Work included:

  • resurfacing from just west of County Road (CR) B9 to Elk River Road;
  • intersection and signal work at Elk River Road; and
  • drainage, sidewalk and curb ramp upgrades.