US 50 and CO 348 Culvert Repairs

Project Status: Complete

Project Facts

  • Cost:
    $1.1 million
  • Average Annual Daily Traffic:
    3,200 (US 50)
    560 (CO 3F48)

From July to September 2016, crews on this project lined the US 50 culvert at mile point (MP) 108.8 with a cure-in-place pipe. Crews also replaced a 48-inch corrugated metal pipe on CO 348, at MP 6.64, with an 8-by-to-foot concrete box culvert.

This work will improve drainage flow through both pipes.