US 50 Curb Ramp Upgrades in South Delta

For this multi-phase project, crews improved curb ramps to bring the following locations into compliance with Public Right-of-Way Accessibility Guidelines (PROWAG) requirements:

  1. US Highway 50 in north Delta—with some work on Colorado Highway 92 (completed Sept. 17 - November 2018);
  2. US 50 from CO 92 to Bluff Street (Dec. 7, 2018 - May 2019); and
  3. CO 348 from 6th Street to the Uncompahgre River (Dec. 7, 2018 - May 2019).

Specifically, crews upgraded curb ramps, curb, gutter and sidewalk.

Project Facts

  • Cost: $380,000
  • Contractor: Western Gravel Constructors
  • Timeline:
    • Phase 1: September - November 2018
    • Phase 2: December 2018 - May 2019
  • Location:
    • Phase 1: On US Highway 50 in Delta County, from mile points 69 to 72, and on Colorado Highway 92 from mile points 0 to 1.5
      • Phase 2: US 50 from CO 92 to Bluff Street; and on CO 348 from 6th Street to the Uncompahgre River


Sidewalks and curb/curb ramps on US Highway 50 in the project area