US 550 Intersection Improvements at 17th, 22nd & 32nd Streets in Durango
Project complete
            
          Project Overview
Crews on this project completed the following work:
- replaced signals
 - improved the road
 - constructed ramps and sidewalks at each intersection that comply with the Americans with Disabilities Act (ADA)
 - improved storm-drain inlets
 - added and upgrading pavement markings for bike lanes, bike boxes and stop bars at crosswalks
 - added a sidewalk at the small island (the triangle area at the east edge of Fassbinder Park) between 17th Street and West Park Avenue to provide pedestrians refuge at a lengthy crossing
 - replaced a span-wire signal at 22nd Street with new signal heads, poles and mast arms
 - replaced the traffic signal at 32nd Street
 - added and upgraded pavement markings between 32nd Street and East 2nd Avenue to provide two left-turn lanes onto southbound Main Avenue, one shared through/right turn-lane, and a small raised island at the intersection designating a free-flow right turn onto northbound Main Avenue (US 550)
 
Project Facts
- Cost: $3.6 million
 - Contractor: Kirkland Construction
 - Timeline: Early October 2018 to Memorial Day 2019
 - Location: Where US Highway 550 (aka, North Main Avenue) intersects with 17th, 22nd and 32nd streets in Durango
 