US 24 Trout Creek Pass Passing Lanes
Project completed
Project Overview
This project— on US 24 from mile posts 217.5 to 222.64—increased safety by designating passing zones for motorists in this area, northeast of Johnson Village. Project work started in July 2015 and was completed in December 2016.
Work included:
- the construction of two eastbound passing lanes—one between mile posts 217.5 and 218.5, and the other between mile posts 221.7 and 222.64
- rock excavation
- pavement reconstruction
- earthwork
- signing and striping
Project Facts
- Cost:
$6.6 million
Improvement Area
- 5 miles
Project Team
- Contractor(s): Tezak Heavy Equipment, Inc.,