US 50 Delta Signal Improvements

Project Complete!

The Colorado Department of Transportation will begin signal work on May 2, 2022, along US Highway 50 in Delta from Mile Point 71.1 to MP 71.5. Sturgeon Electric Company from Denver CO is the contractor for this project.

Signal improvements will take place at four different locations on US 50 in Delta at 3rd, 4th, 5th, and 6th Street. Work will consist of new conduit, wiring, pedestrian push buttons, vehicle detection, replacement of controller cabinets and signal head back plates. Additional work will consist of new signs and thermoplastic pavement marking.


Project Benefits

Traffic signals are a vital part of controlling traffic in a safe and efficient manner by providing regulated movement. Vehicle detection will reduce unnecessary delays and stops at the intersection while improving travel times and increasing the amount of traffic that an intersection can handle.


Project Facts

  • Cost: $1.1 Million
  • Contractor: Sturgeon Electric
  • Timeline: May - September 2022
  • Location: Four different locations on US 50 in Delta at 3rd, 4th, 5th, and 6th Street, Delta County

US 50 Delta Signal improvements project map

(Click image to enlarge)