US 50 Improvements at Sargents

Project Facts

  • Cost: $4.4 million
  • Contractor: APC Southern Construction
  • Timeline: May - July 2021
  • Location: US Highway 50 at Sargents in Sagauche County

Project Complete!

The work includes resurfacing of approximately 10 miles of roadway, that will incorporate deck milling, sealing and repaving at 2 bridge structures; shouldering; erosion control; guardrail replacement; signing and final striping. The project was contracted to APC Southern Construction, of Golden, for 4.4 million and is expected to be completed in July 2021.