Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. US 50 East
  5. Assets
  6. July 2016 Public Hearings
Resources
  • Projects
  • Assets
  • Studies
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 172 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Resurfacing North of Walsenburg Project
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • I-70 Concrete Slab Replacement from West Rifle to Silt
  • CO 64 Bridges west of Meeker
  • US 24 Curve Correction in Teller County
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • I-70 East of DeBeque Resurfacing
  • CO 114 Overlay, Gunnison to Saguache County
  • CO 64 & CO 13 Meeker Resurfacing Project
  • CO 133 Rockfall Project North of McClure Pass to South of Carbondale
  • CO 9 Surface Treatment in Summit and Grand County
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • ADA Ramp Project on US 6 & South Frontage Road in Eagle and Vail
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 257 Resurfacing US 34 Business to Walnut Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 67 Safety Improvements in Douglas & Teller Counties
  • US 85 at WCR 66 Acceleration Lanes in North Greeley
  • CO 83 Resurfacing in Douglas County
  • Southwest Colorado Pavement Marking
  • CO 92 Chip Seal Project in Montrose and Delta County
  • US 50 Cañon City Road Maintenance
  • CO 138 Logan County Widening Project
  • US 85 Platteville Resurfacing Between CO 60 and CO 66
  • CO 14 and US 40 Crack Sealing in Jackson and Grand Counties
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • CO 13 Chip Seal North of Craig
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • CO 121 Signal Improvements in Jefferson County
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • Flood Related Projects
    • US 50 East
      • Project Overview
      • Schedule
      • Previous Study
      • Public Hearings on Tier 1 Draft Environmental Impact Statement
      • FAQ
      • Draft Tier 1 Environmental Impact Statement
      • Combined Final Tier 1 Environmental Impact Statement/Record of Decision
      • Get Involved
      • Assets
        • bird_s.jpg
        • 4-18-07_50_Proc_Sched_op.jpg
        • 50committee.jpg
        • final_step_phase_3.jpg
        • looking-at-maps.jpg
        • fowler_depot_s.jpg
        • large-group-shot.jpg
        • corr_alt.pdf
        • recent_meeting.jpg
        • Semi_Manz.jpg
        • US50.jpg
        • US50Corridormeeting.jpg
        • throught_town_typical_secti.gif
        • throught_town_typical_section.jpg
        • tier_1_corridor_alter.jpg
        • orange-hat_s.jpg
        • Aerial Maps
        • Regional View
        • US 50 Regional View Map
        • Appendix G_Public Hearing Transcripts_December 2017_Final.pdf
        • Appendix F_Pref Alt by Location_December 2017_Final.pdf
        • Appendix E_Natural Resources Mitigation Plan_December 2017_Final.pdf
        • Appendix D_FHWA Interim Guidance_December 2017_Final.pdf
        • Appendix C_Agency and Public Involvement_Combined PDFs_December 2017_Final.pdf
        • Appendix B_Range of Alternatives Tech Memo_December 2017_Final.pdf
        • Appendix A_12Wetland and Riparian TM_December 2017_Final.pdf
        • Appendix A_11Traffic Noise TM_December 2017_Final.pdf
        • Appendix A_10Section 4(f) Section 6(f) TM_December 2017_Final.pdf
        • Appendix A_09Minority Low Income TM_December 2017_Final.pdf
        • Appendix A_08Land Use and Social Considerations TM_December 2017_Final.pdf
        • Appendix A_07Historic and Arch Resources TM_December 2017_Final.pdf
        • Appendix A_06Hazardous Materials TM_December 2017_Final.pdf
        • Appendix A_05Economics TM_December 2017_Final.pdf
        • Appendix A_04Cumulative Effects TM_December 2017_Final.pdf
        • Appendix A_03Biological Resources TM_December 2017_Final.pdf
        • Appendix A_02Air Quality TM_December 2017_Final.pdf
        • Appendix A_01Agricultural TM_December 2017_Final.pdf
        • 03 Acronyms_December 2017_Final (1).pdf
        • 03 Acronyms_December 2017_Final.pdf
        • 02 Abstract_December 2017_Final.pdf
        • 01 Signature Page_December 2017_Final.pdf
        • 18 Index_December 2017_Master.pdf
        • 17 Chapter 12 Record of Decision_December 2017_Final.pdf
        • 16 Chapter 11 List of Recipients_December 2017_Final.pdf
        • 15 Chapter 10 List of Preparers_December 2017_Final.pdf
        • 14 Chapter 9 References_December 2017_Final.pdf
        • 13 Chapter 8 Mitigation Strategies_December 2017_Final.pdf
        • 12 Chapter 7 Public Involvement_December 2017_Final.pdf
        • 11 Chapter 6 Preferred Alternative_December 2017_Final.pdf
        • 10 Chapter 5 Section 4(f)_December 2017_Final.pdf
        • 09 Chapter 4 Affected Environment_December 2017_Final.pdf
        • 08 Chapter 3 Alternatives Considered_December 2017_Final.pdf
        • 07 Chapter 2 Purpose and Need_December 2017_Final.pdf
        • 06 Chapter 1 Introduction_December 2017_Final.pdf
        • 05 Summary_December 2017_Final.pdf
        • Major Elements of Proposed Improvements.pdf
        • US 550 public meeting notes.pdf
        • US 50 Corridor East Tier 1 Final Environmental Impact Statement and Record of Decision - Appendix E.pdf
        • July 2016 Public Hearings
          • Public Hearing Exhibits
          • US 50 Corridor East Tier 1 EIS Public Hearings Presentation Cover
          • Project Alternatives Aerial Plot
July 2016 Public Hearings https://www.codot.gov/projects/archived-project-sites/us50e/assets/july-2016-public-hearings https://www.codot.gov/@@site-logo/siteLogo.png

July 2016 Public Hearings

Public Hearing Exhibits thumbnail image Public Hearing Exhibits
US 50 Corridor East Tier 1 EIS Public Hearings Presentation Cover thumbnail image US 50 Corridor East Tier 1 EIS Public Hearings Presentation Cover
Project Alternatives Aerial Plot thumbnail image Project Alternatives Aerial Plot

Contact Us

303-209-2324
[email protected]

En Español
Para más información cerca de la carretera US 50 Este, por favor llame al 303-209-2324.

Mailing Address
CDOT-US 50 Corridor C/O
7604 Technology Way, Suite 400
Denver, CO 80237

Sign Up for Travel Alerts & Project News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo