Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. US 50 East
  5. Documents
Resources
  • Projects
  • Assets
  • Studies
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 207 & CO 266 Resurfacing
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 138 Logan County Widening Project
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • CO 88/Belleview Traffic Safety Project
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 CCTV Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • I-25 Acceleration/Deceleration Lanes Fillmore Street to Garden of the Gods Road
  • CO 392 Weld County Safety Project
  • US 50B Drainage Improvements east of Swink
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • US 50 East
      • Project Overview
      • Schedule
      • Previous Study
      • Public Hearings on Tier 1 Draft Environmental Impact Statement
      • FAQ
      • Draft Tier 1 Environmental Impact Statement
      • Combined Final Tier 1 Environmental Impact Statement/Record of Decision
      • Get Involved
      • Documents
        • 12-01-09_construction_info.pdf
        • 2-1-06_press_release.pdf
        • 2nd_yr_env_study_progress.pdf
        • 4-22-09_message_board_installation_on_highway50.pdf
        • 8-31-05_support.pdf
        • 8-8-05_US50_hasty.pdf
        • 8-9-05_US50_fowler.pdf
        • 8-9-05_US50_slab_replacement_lama.pdf
        • acquisition.pdf
        • Bent_21.pdf
        • Bent_22.pdf
        • Bent_23.pdf
        • Bent_24.pdf
        • Bent_25.pdf
        • Bent_26.pdf
        • Bent_27.pdf
        • Bent_28.pdf
        • Bent_29.pdf
        • Bent_29_s.pdf
        • Bent_30.pdf
        • Bent_31.pdf
        • Bent_32_s.pdf
        • Bent_33.pdf
        • bridge_repairs_replacements_032107.pdf
        • business_farms.pdf
        • comment_form_02-21-06.pdf
        • earmarked_funds_071107.pdf
        • ESGuide5-12-05e-book.pdf
        • faq_press_release12_15_06.pdf
        • fowler_ passing _lanes_070108.pdf
        • i-fowler1_h_s_sif_n.pdf
        • i-manzanola3_rr.pdf
        • newsfromcdot9_3_09.pdf
        • newsletter1-30-06s.pdf
        • newsletter_08_web.pdf
        • newsletter_outside_2008_s.pdf
        • newsletterinside_2008_s.pdf
        • oh_2_28_06
        • oh_8-07
        • Otero_11s.pdf
        • Otero_12s.pdf
        • Otero_13s.pdf
        • Otero_14s.pdf
        • Otero_15s.pdf
        • Otero_16s.pdf
        • Otero_17s.pdf
        • Otero_18s.pdf
        • Otero_19s.pdf
        • Otero_20.pdf
        • Otero_Co-1 2.pdf
        • pr_09-12-05.pdf
        • pr_6-28-05.pdf
        • pr_7-18-05.pdf
        • pr_scoping_mtgs _2-14-06_ final.pdf
        • Prowers_34.pdf
        • Prowers_35.pdf
        • Prowers_36.pdf
        • Prowers_37.pdf
        • Prowers_38.pdf
        • Prowers_39.pdf
        • Prowers_40.pdf
        • Prowers_41.pdf
        • Prowers_42.pdf
        • Prowers_43.pdf
        • Prowers_44.pdf
        • Public Hearing Notice
        • Pueblo_1.pdf
        • Pueblo_10s.pdf
        • Pueblo_2.pdf
        • Pueblo_2_s.pdf
        • Pueblo_3.pdf
        • Pueblo_4.pdf
        • Pueblo_5.pdf
        • Pueblo_6.pdf
        • Pueblo_7.pdf
        • Pueblo_8.pdf
        • Pueblo_9.pdf
        • regional view 11x41 2-1-06 s.pdf
        • reports
        • residential.pdf
        • row
        • swink-laJunta_1000-1.pdf
        • through_town_typical_section.pdf
        • typical_section_1.pdf
        • US50_8_2007_public_meetings_press_release.pdf
        • us50_process_schedule_web.pdf
        • us50fall2009update9_1_09.pdf
        • Viewing Locations
Documents https://www.codot.gov/projects/archived-project-sites/us50e/documents https://www.codot.gov/@@site-logo/siteLogo.png

Documents

12-01-09_construction_info.pdf
2-1-06_press_release.pdf
2nd_yr_env_study_progress.pdf
4-22-09_message_board_installation_on_highway50.pdf
8-31-05_support.pdf
8-8-05_US50_hasty.pdf
8-9-05_US50_fowler.pdf
8-9-05_US50_slab_replacement_lama.pdf
acquisition.pdf
Bent_21.pdf
Bent_22.pdf
Bent_23.pdf
Bent_24.pdf
Bent_25.pdf
Bent_26.pdf
Bent_27.pdf
Bent_28.pdf
Bent_29.pdf
Bent_29_s.pdf
Bent_30.pdf
  • 1
  • 2
  • 3
  • 4
  • 5
  • Next 20 items

Contact Us

303-209-2324
[email protected]

En Español
Para más información cerca de la carretera US 50 Este, por favor llame al 303-209-2324.

Mailing Address
CDOT-US 50 Corridor C/O
7604 Technology Way, Suite 400
Denver, CO 80237

Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo