CO 88 Arapahoe Road & I-25 Interchange

Project completed

Project Overview

In August 2009, CDOT began a safety and capacity improvement project on Arapahoe Road between Yosemite Street and Boston/Clinton Street. The project adds an additional through lane in each direction underneath the structure by utilizing the existing on-ramp roadway. This means that the third lane will be separated from the existing through lanes by the bridge pillars. The existing configuration for on-ramp traffic, pedestrian crossings and sidewalks will not be impacted.

Other improvements include:

  • Adds a dedicated turn lane from westbound Arapahoe Road to northbound Yosemite Street
  • Modifies the center median to improve the left turn movement from southbound I-25 to eastbound Arapahoe Road
  • Improves signage to help direct motorists to proper lane assignments
  • Improves sight distance for pedestrians at various locations within the project limits on Arapahoe Road

Project Schedule

  • Construction Begins - October 2009
  • Roadway Work Complete - December 2009/January 2010
  • Landscaping - Spring 2010
  • Project Complete - June 2010