Boulder Americans with Disabilities Act Ramp Enhancement
Project Facts
- Cost: $1.1 million
- Contractor: Western Gravel Constuctors
- Timeline: January 2020 - May 2020
- Location: Various locations in Boulder: CO 157/Foothills (MP 0-4.6), CO 119/Canyon Dr. (mile point 40.9-41.9), CO 7/Canyon Dr. (MP 49.5-50.7),• CO 93/Broadway (MP 15.8-18.8),US 36/28th (MP 33.9-39.5), US 36/Baseline (MP 0-0.4)
About the Project
The Colorado Department of Transportation (CDOT) and contractor Western Gravel Constructors will begin an ADA ramp enhancement in Boulder CO. on January 6, 2020. The project will take place at 56 different locations on Colorado Highway 119, CO 7, CO 93, CO 157 and US Highway 36.
Enhancements for the $1.1 million project include:
- Installing 97 ADA compliant ramps, to existing ramps and to areas that currently do not have existing ramps,
- to bring ramps into compliance with the Public Right of Way Accessibility Guidelines (PROWAG) requirements.
- Work will consist of improvements to curb ramps, curb, gutter, and sidewalk.
Locations
The project will take place at the following locations:
| CO 157/Foothills (MP 0-= to 4.6) |
119/Canyon Drive (mile point 40.9 to 41.9) |
CO 7/Canyon Drive (MP 49.5 to 50.7) |
|
Valmont Road |
Pearl Street |
13th Street |
|
Pearl Parkway & Foothills Parkway southbound Off-Ramp |
3rd Street |
15th Street |
|
Pearl Parkway & Foothills Parkway northbound Off-Ramp |
4th Street |
17th Street |
|
Baseline Road |
5th Street |
18th Street |
|
Table Mesa Drive & Foothills southbound Off-Ramp |
6th Street |
19th Street |
|
Broadway |
21st Street |
|
|
22nd Street |
||
|
23rd Street |
||
|
Folsom Street |
||
|
26th Street |