US 6 Brush Creek Bridge Replacement

Project Complete

Project Background

The Brush Creek Bridge is located on US 6 in Eagle, Colorado between mile markers 148 and 149.  It was built in 1935 and is now functionally obsolete and substandard. By reconstructing the bridge, we will create a safer and more efficient trip for drivers, as US 6 between Eagle and Gypsum is a major commuter route for workers as well as for students at the local high school. It also provides access to businesses and the Eagle County Regional Airport from the East.  The bridge carries Highway 6 over Brush Creek near an environmentally sensitive wetlands area. Highway 6 also parallels the Union Pacific Railroad in this area.

Project Overview

This project will be located on Highway 6 immediately west of Eagle between mile markers 148 and 149.  The existing bridge will be removed and replaced with a new bridge. Additionally, a detour will be provided adjacent to the project throughout construction. CDOT is currently in preliminary design phases for this project. Throughout the planning and execution phases of the project, CDOT will aim to reduce impacts on the traveling public and minimize impacts to the environment while providing an economical solution.

Project Timeline

A construction schedule is not defined at this time. The design project team intends to have the project at approximately 80% design in spring of 2013, at which time some details will still need to be determined. CDOT realizes that construction timing with regards to the Eagle interchange project is crucial and intends to coordinate construction on the Brush Creek Bridge to minimize impacts on the traveling public between these two projects.

Anticipated Project Impacts

A full detour will be provided through the project site during construction. Occasional delays should also be expected.