CO 7 from I-25 to US 287 Intelligent Transportation System installation
Project Complete
This project installed fiber optic cable on CO 7, from I-25 to US 287. This will accommodate the future implementation of the intelligent transportation system (ITS), which will include the use of connected vehicles (aka, driverless cars).
Project work, estimated to cost $3 million (and valued at $15 million), was completed during the day, Monday - Friday, through November 2016.
Project Team
- Project Engineer(s): Jill Scott
- Contractor(s): Zayo, Paonia, Fiber Works and Dillie and Kuhn
CDOT has shared its right-of-way and existing infrastructure with Zayo, in exchange for its construction work on this project.