CO 115 and CO 9 Critical Culverts
Project completed
About the Project:
CO 9 - MP 27.77: Slip line and Extend Culvert, Place Grouted Riprap and Riprap at Outlet, Temporary Signal will be used for Traffic Control at this location.
CO 115 - MP 42.41: Spray line Culvert, Excavate Material, Grade Ditch Slopes, and line ditch with Concrete at Outlet, Place Riprap and construct small maintenance access road at Outlet.
Work Schedule
- Work is complete
Traffic Impacts
- No further impacts
Project Facts
- Cost: $700,000
- Contractor: American West Construction
- Timeline: July through Late August 2021
- Location: CO 9 at MP 27.77 in Park County, CO 115 at MP 42.41 in El Paso County