I-25 Exit 11 Interchange Improvements

Project completed

About the Project

This project entails upgrading the infrastructure and making safety, traffic flow and aesthetic improvements at I-25/Exit 11 just south of the City of Trinidad. Specific work includes ramp and lane widening and building crossovers; bridge replacement; building roundabouts to improve traffic flow; building retaining walls; improving access to the Port of Entry; retrofitting curb ramps for ADA compliance; adding guardrail and other safety features to the new bridge for pedestrians and cyclists, and incorporating urban streetscapes and new lighting and signage.

The Colorado Department of Transportation and prime contractor Flatiron Construction Corporation will implement improved infrastructure and traffic flow solutions over the next 18-20 months. Work will be performed in phases to accomplish the following:

  • Widening the on/off ramps from I-25 to Exit 11
  • Installing roundabouts
  • Replacing the existing bridge
  • Increasing lane and bridge capacity
  • Enhancing access for oversized loads
  • Adding pedestrian/cyclist facilities
  • Introducing aesthetic improvements

Construction Phasing

  • Phase I – Mobilization, erosion control, embankment work, temporary onsite detour pavement
  • Phase 2 – Build retaining walls, ramp crossover work, construct new bridge, drainage work, roundabout and roadway work, sidewalks, and ADA ramps.
  • Phase 3 – Roundabout retaining walls, remove existing bridge, utility work, paving.
  • Phase 4 – Drainage work, embankment work, roadway work, guardrail and safety features, signage, signals and lighting, clean culverts, landscaping.

Project Facts

  • Cost: $12.6 Million
  • Contractor: Flatiron Construction Corp
  • Timeline:  July 2021 to March 2023
  • Location: I-25, Exit 11 south of Trinidad

Work Schedule & Traffic Impacts

  • No additional lane closures or restrictions are expected.

General Frequently Asked Questions

  1. 1. Why is this project happening?
    • Improvements to the interchange are needed to support increased traffic on the I-25 corridor, to add capacity for visitors to area parks like Fishers Peak, and to improve traffic flow at the exits. In its current state, the configuration and supporting bridge at Exit 11 are inadequate to sustain various modes of transportation and for future economic growth in the area.
  2. What improvements will be made?
    • CDOT is replacing the bridge, widening the on and off ramps, building new ramp crossovers, installing new roundabouts at the east and west sides of Exit 11, and making aesthetic and safety improvements.
  3. How will this project benefit the community?
    • Improving Exit 11 will increase economic investment in the area which will support the local and broader communities.
  4. How long will the project take?
    • CDOT anticipates the project taking between 18-20 months.
  5. How much will the project cost and how is it funded?
    • The project cost is approximately $12.6 million dollars. This is 100% funded by the state.

Travel Impacts

  1. What impacts can I expect?
    CDOT expects only minor traffic shifts and minimal impacts to the traveling public through the duration of this project.
  2. Will there be detours?
    No. No detour routes will be in place. However, CDOT is building some onsite temporary detour pavement on which to route traffic during certain phases of construction.
  3. Will there be impacts to the ramps?
    There will be occasional single lane closures on the ramps and at the approaches to the ramps on I-25 but no full ramp closures.
  4. How will this project impact the frontage roads?
    Traffic will remain the same on the frontage roads during construction. No closures or impacts are expected.

Commercial Vehicles & Oversized Loads

  1. Will there be any impacts or detours in place for trucks and commercial vehicles?
    Minor traffic shifts will exist, but no immediate impacts related to commercial vehicles.
  2. Will the Port of Entry still be open?
    Yes, the Port of Entry will remain open 24/7.