I-70 Frontage Road - East of Idaho Springs

Project Complete

What is the I-70 Frontage Road Improvements Project?

The Colorado Department of Transportation (CDOT) has initiated the I-70 Frontage Road Improvements project as part of the commitments from the I-70 Mountain Corridor Programmatic Environmental Impact Statement (PEIS).  The goal of this project is to develop context sensitive solutions (CSS) for the Frontage Road to provide enhanced safety and mobility for vehicles, pedestrians, and bicyclists.  Project ideas will be developed and studied in coordination with the Project Leadership Team and will be evaluated for environmental impacts in a Categorical Exclusion (Cat Ex).

The frontage road project will be developed in two phases:

  • Phase I – State funds are immediately available to provide improvements to a portion of the frontage road.  Both local and through traffic will benefit from these improvements planned for construction in the summer of 2012.  Approximately $6 million dollars are available for the design and construction.  CDOT is working with the I-70 Frontage Project Leadership and Technical Teams (PLT/TT) to identify locations of the immediate improvements.  The Phase I immediate improvements are anticipated to begin near the gravel section of CR 314 and extend to the Hidden Valley/Central City Interchange (Exit 243).  No federal funds will be used on this phase.
  • Phase II – Funding for future construction has not been identified.  Phase II will include the remaining frontage road and Greenway construction or reconstruction to full width between eastern Idaho Springs (I-70 Exit 241) and the Hidden Valley/Central City Interchange (Exit 243).   Phase II of the frontage road improvements will be developed as funding becomes available for roadway and trail improvements.  As cost estimates are being developed, project partners for additional funding are currently being identified.

The final Cat Ex will provide environmental clearance for both Phase I and Phase II of the Frontage Road.

How does this project interact with the Twin Tunnels Environmental Assessment (EA)?

The I-70 Frontage Road project is independent of the Twin Tunnels project, but elements of the Frontage Road are expected to be used as part of the detour during construction of the Twin Tunnels project.  Both projects have similar core values and stakeholders.  Phase I of the I-70 Frontage Road project is state funded and will provide immediate safety benefits to the existing Frontage Road with construction starting in Spring/Summer 2012.  It is anticipated that Phase I of the Frontage Road project will be completed in time for use as part of the detour for Twin Tunnels improvements.

Project Schedule

For access to meeting materials mentioned below, please submit a Records Request.

Project Milestone

Meeting Materials

Date

Project Leadership and Technical Team (PLT/TT) Kick-off Meeting

Presentation

Minutes

 

Aug 31, 2011

 

Twin Tunnels EA Open House

Flyer

Comment Sheet

Comment Summary

Sept 27, 2011

SWEEP Meeting Meeting Notes Oct 19, 2011

PLT/TT #2

Presentation

Minutes

 

Oct 26, 2011

PLT/TT #2.5 Presentation Minutes Handout Nov 1, 2011
Greenway Issue Task Force Meeting #1 Meeting Notes Nov 22, 2011

Field Inspection Review (Phase I and II)

Agenda

Minutes

 

Dec 1, 2011

PLT/TT #3 Presentation Minutes

Handout 1

Handout 2

Dec 15, 2011

 

 

 

 

Jan 2012

PLT/TT #4 Presentation Minutes Jan 18, 2012
PLT/TT #5 Presentation Minutes Jan 31, 2012

Final Office Review (Phase I)

 

 

 

Mar 2012

Categorical Exclusion (Phase I and II) Report Final 128 Appendix Mar 2012
PLT/TT #6 Presentation Minutes Apr 5, 2012

Project Advertisement Date (Phase I)

 

 

 

Apr 2012

Construction (Phase I)

 

 

 

Summer /Fall 2012

Project Documents

The below project documents are available by submitting a records request:

  • FIR Comment Response
  • I-70 Frontage Road Concept Development and Screening Report January 2012
  • Draft I-70 Frontage Road Concept Development and Screening Report December 2011
  • Work Plan (including Stakeholder Involvement Plan)

Project Leadership/Technical Team

Benjamin

Acimovic

Region 1 Mtn Residency

CDOT

Tim

Allen

Public Works Director

Clear Creek County

Kelly

Babeon

Fire Chief

Clear Creek Fire Authority

Rick

Beck

Public Works Division

Clear Creek County

Marjorie Bell Nearby Property Owner

Jim

Bemelen

I-70 Mtn Corridor Manager

CDOT

John

Bordoni

Public Works Superintendent

City of Idaho Springs

Margaret

Bowes

Program Manager

I-70 Coalition

Tom Breslin County Administrator Clear Creek County

Dan

Ebert

General Manager

Buffalo Restaurant

Mary Keith

Floyd

Consultant Environmental Lead

Michael Baker Jr., Inc.

Craig

Friesen

Consultant Project Manager

Michael Baker Jr., Inc.

Janet

Gerak

Environmental Manager

CDOT

Pete

Helseth

CCC Greenway Project Manager

Clear Creek Open Space Commission

Tamara

Keefe

Consultant Team

Michael Baker Jr., Inc.

Don

Krueger

Sheriff

Clear Creek County Sheriff's Office

Larry & Gail Lancaster Scott Lancaster Path

Mary Jane

Loevlie

Member

Historical Society of Idaho Springs

Jason

Longsdorf

Consultant PLT Task Lead

Parsons Brinckerhoff

Dan

Lovato

District Ranger

Clear Creek Ranger District, Arapaho National Forest

Bill

Macy

Former Mayor

City of Idaho Springs

Tim

Mauck

County Commissioner

Clear Creek County

Ron

Prater

Captain

Colorado State Patrol

Suzen

Raymond

Rafting Community Representative

Mile Hi Rafting

John

Rice

Rafting Community Representative

Clear Creek Rafting Co.

David

Singer

I-70 Corridor Environmental Manager

CDOT

JoAnn

Sorensen

Land Use Director

Clear Creek County

Melinda

Urban

Operations Engineer

FHWA  - Colorado Division

Jeff

Wilson

Consultant Engineering Lead

Parsons Brinckerhoff

David

Wohlers

Chief

Idaho Springs Police Department