I-70 Over Havana Bridge Replacement

Project Complete

About the Project

From May 2015 through 2017, crews replaced the structurally deficient I-70 bridge over Havana Street. The bridge was removed in phases as crews built the new one.

The $25 million project included interchange ramp improvements, lighting upgrades, new asphalt paving, retaining walls, concrete shoulder improvements and construction of a railroad tunnel structure under I-70.

The project used several innovative construction techniques, including the use of strategic phasing and pre-cast elements to deliver the project on an accelerated timeline, which reduced impacts to commuters, businesses and motorists.

Project Facts

  • Cost: $25 million
  • Contractor(s): Lawrence Construction

Design-Build Overview

The purpose of this project is to replace the bridge on I-70 over Havana Street which is in poor condition and functionally obsolete. The Colorado Department of Transportation (CDOT), in cooperation with the Colorado Bridge Enterprise (CBE), has determined that Design-Build delivery provides the best process to complete this project, and is currently developing documentation to support the issuance of a design-build contract to replace this structure, No. E-17-JP.

The Construction budget for this project is currently estimated to be between $20-24 million, and the intent of CDOT is to use the following project goals to determine Best Value during the selection process:

  • Minimize inconvenience to stakeholders and the public during construction
  • Maintain compatibility with the I-70 East EIS and ultimate I-70 Corridor improvements
  • Maximize safety of workers and traveling public
  • Minimize project delivery time

Interstate 70 is part of the national interstate highway system and serves as the transportation backbone for east-west travel in the Denver region and the state. Traffic volumes within the viscinity of the project exceeds 190,000 Average Annual Daily Traffic (AADT). Safe and efficient traffic management through the Corridor during construction is a critical success factor. Additionally, the project resides within the boundaries of the I-70 East EIS, and improvements installed as a result of the I-70 over Havana St. Design-Build project must be coordinated and compatable with alternatives developed as part of the ongoing I-70 East EIS.

The project will generally include bridge demolition and reconstruction, retaining walls, existing interchange ramp improvements, and upgrading interchancge lighting to current standards.

CDOT intends to use a two-phase procurement process to award a Contract for Design-Build Services, which includes a qualifications based short-listing of the most qualified Design-Build Service teams through a Request for Qualifications(RFQ), followed by an evaluation of, those shortlisted teams, responses to CDOT’s Request for Proposal (RFP). Selection and Contract award will be based on Best Value as determined by CDOT.