I-70 Viaduct Expansion Joint Repairs
About the Project
In September 2008, the Colorado Department of Transportation (CDOT) began an expansion joint repair project on the I-70 viaduct from Brighton Boulevard to Colorado Boulevard. The project repaired or replaced 60 bridge expansion joints on the 45-year old structure, improve drainage and replace the bridge rail. The project was strictly a maintenance project designed to extend the life of the bridge and it is not connected with the I-70 Environmental Impact Statement (EIS).
The project was completed in the spring of 2011. American Civil Constructors, Inc. was the contractor for this project.
Project Schedule
While the project is underway, lane closures on I-70 will take place during nighttime hours only, Sunday through Friday. Motorists can expect single lane closures starting at 8 p.m. with a second lane closing at 10 p.m. All lanes will reopen by 5:30 a.m. each day. In addition, eastbound 46th Avenue between Brighton and York is closed 24 hours a day, seven days a week.