Montrose Signal Replacement

Project Complete

Project Facts
 

  • Cost:
    $1.4 million
  • Average Annual Daily Traffic:
    22,000

Project Team

  • Contractor(s): CS Construction, Inc.

Project Overview

This project replaced traffic signal equipment to reduce necessary maintenance and lengthen its structural life expectancy.

Project work started on May 2, 2016 and was completed in fall 2016

Work locations included:

  • US 50 (Townsend Avenue)
  • La Salle Road and US 50
  • South 7th Street and US 50
  • South 12th Street - Columbia Way