CO 119 North Clear Creek Valley Restoration
Project Overview
The North Clear Creek Valley Restoration Project is located in Gilpin County along Colorado State Highway 119, starting in the City of Black Hawk and continuing east for approximately 1.5 miles.
The goal of the North Clear Creek Project is to:
- Improve safety and access for tourist and local traffic in Black Hawk
- Improve surface water quality of North Clear Creek to be habitable for aquatic life
- Reduce metals toxicity to aquatic insects
- Restore brown trout populations south of Black Hawk
- Improve drinking water quality for downstream providers
For more information, visit the CO 119 Mine Drainage Pipeline project being conducted by the Colorado Department of Public Health and Environment.
From additional turn lanes, to parking area improvements, to bridge widening and rock fall mitigation, the projects that are included in the Restoration of North Clear Creek will improve safety, environmental and recreational issues in the Black Hawk area.
Environmental & Recreational Improvements
North Clear Creek
The environmental cleanup involved in this project will allow for additional recreation along the North Fork of Clear Creek. This section of the creek, which runs between Black Hawk and the confluence with the main channel, is currently considered “dead”, or unable to support and sustain plant, aquatic and biologic life, due to the mine drainage and heavy metal pollutants in its runoff.
Similar pollutants once clogged the main (South) channel of the Creek near Idaho Springs, but with help from the CDPHE and the EPA, the Argo Tunnel and treatment plant was built and has revitalized that section of the stream. After years of research a similar plan has been created to restore the North Fork of Clear Creek.
The result will lead to the revitalization of a once forgotten portion of Clear Creek, and in time it will again support aquatic life. Removing the heavy metals from this body of water will improve the water quality of the main stem of Clear Creek, which is used by fishermen, rafters, and water enthusiasts for recreational activities. The main stem of Clear Creek is also a major source of drinking water for several suburban cities downstream in the Denver Metro area, including Golden, Thornton and Northglenn. Thus the cleanup of this stream will directly improve water in several communities.
Once the water quality in the North Fork has been restored, hiking trails and a bike path will be created to encourage additional public use of the area.
Wildlife Overpass
Over the years several roadway improvements have caused an interruption in the migratory pattern of the native Long Horn Sheep in the Black Hawk area, causing unnecessary accidents and herd casualties. The creation of a wildlife overpass across SH 119 at Mile Post 0.1, which follows the traditional crossing of the sheep, will help to re-route them back along a safe and more natural path, so they can reach grazing areas on along the creek.
This bridge will be the first of its kind in the United States for Long Horn Sheep. NCCMAC hopes its success will lead to similar projects across the country to help keep wildlife safe.
Superfund Cleanup
What is a Superfund Site?
Superfund is the name given to the federal environmental program established to address abandoned hazardous waste sites. It is also the name of the fund established by the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (CERCLA statute, CERCLA overview). This law was enacted by Congress in the wake of the discovery of toxic waste dumps such as Love Canal and Times Beach in the 1970s. It allows the EPA to clean up such sites and to compel responsible parties to perform cleanups or reimburse the government for EPA-lead cleanups. EPA's Office of Solid Waste and Emergency Response (OSWER) in Washington, D.C. oversees the Superfund program, with regional input.
The Superfund cleanup process is complex. It involves the steps taken to assess sites, place them on the National Priorities List, and establish and implement appropriate cleanup plans. This is the long-term cleanup process. In addition, the EPA has the authority to (1) conduct removal actions where immediate action needs to be taken, (2) enforce against potentially responsible parties, (3) ensure community involvement, (4) involve states, and (5) ensure long-term protectiveness.
The blueprint for these activities is the National Oil and Hazardous Substances Pollution Consistency Plan (NCP), a regulation applicable to all federal agencies involved in responding to hazardous substance releases.
Traffic Safety Improvements
From 1992 to 2006 there were 1,028 accidents on the stretch of SH 119 that runs through the city of Black Hawk, the majority of which did NOT involve reckless, impaired or careless driving. In fact, most involved one or two passenger vehicles (982), dry roads (439), daylight or lit roadways (523), no driver impairment (694) and no adverse weather conditions (538).
There’s an expectation that traffic volumes on Highway 119 will increase. The state population continues to grow – DRCOG projects a 39.5% increase in the nine-county DRCOG Region by 2030. Plus, casinos are seeing increased traffic flow due to the expanded gambling laws that went into effect July 1, 2009.
What does all this mean? The roadways themselves need improvement, and the NCC Valley Project will address this need with:
- Improvements by straightening the roadway on five sharp curves that do not meet AASHTO standards
- 1.4 mile widening of SH 119 from the Main Street Intersection South, from two lanes expanded to a four-lane, median-divided roadway to improve traffic flow
- Re-alignment of the existing roadway to provide for 45 mph design speed
- Turn lanes at Douglas Mountain Road at SH 119
- Intelligent Transportation Systems
- New bridge structures
- Retaining walls to reduce rock-fall risk
- Emergency call boxes (the narrow valley is without cell service)
- Variable Message Signs (VMS) for traffic and safety advisories
- Traffic cameras for safety monitoring at CDOT’s Traffic Operations Center
- Remote weather stations
- Road closure gates
- LED lights in the pavement of five existing highway tunnels
- Backup for fiber optic line to the Western Slope and corridor VMS boards
The Central City/Clear Creek Superfund Site
The Central City/Clear Creek Superfund Site is located 30 miles west of Denver, in a study area that encompasses the Clear Creek watershed, which spans approximately 400 square miles. Cleanup of this Superfund site is a major portion of the North Clear Creek Valley Project.
Plans include the creation of a Passive Treatment Plant for two polluted mine drainages, the National Tunnel and the Gregory Incline. Seepage and stream flows from these historic mine sites carry toxic minerals and metals into North Clear Creek and other streams. The EPA and Colorado Department of Public Health and Environment (CDPHE) will oversee permanent piping and passive treatment of National Tunnel drainage within the CDOT right-of-way. A sulfate-reducing bioreactor and constructed wetlands will treat outflow before release into the stream.
Mine Waste Pile Capping & Sediment Control will also be included in the Superfund Cleanup Project. Salvage rock from CDOT SH 119 projects will cap numerous mine waste piles. Without protective caps, rainfall and snowmelt causes minerals in the tailings piles to leach into the creek bed.
North Clear Creek – Stream Restoration
Improvements along North Clear Creek include highway widening, construction of water-treatment facilities, installation of a recreation path, improved utilities, and numerous other features. To accommodate these improvements, the North Clear Creek stream channel will need to be relocated at many locations. A stream channel restoration design has been prepared not only for the relocated areas, but also for areas that have been affected by years of mining.
Objectives for the stream channel restoration design include the following items:
- Relocate the channel at specific locations to make way for other improvements while providing a channel planform that is consistent with natural canyon-bound streams.
- Remove instream mine-tailing piles.
- Improve the lateral and vertical stability of the channel with bank stabilization and grade control using bio-engineered methods at appropriate locations.
- Increase hydraulic diversity to enhance aquatic habitat.
- Improve Brown Trout spawning and rearing habitat.
- Enhance recreational opportunities.
These objectives, while important individually, are often combined by Mother Nature in natural streams. For example, in natural canyon-bound streams, Mother Nature typically stabilizes the stream through “boulder steps”, and the pools that form below the steps provide excellent trout habitat. Therefore, the stream restoration design was developed to mimic Mother Nature, in many cases disregarding more traditional engineering approaches.