CO 21 Powers Boulevard Widening Fountain Boulevard to Platte Avenue
Project Facts
- Cost: $6.3 million
Project Team
- Contractor(s): SEMA Construction
About the Project
This project reduced congestion and improved safety on CO 21 by widening two roads and adding turn lanes.
Additionally, this project:
- Widened CO 21 (Powers Boulevard) between US 24 (Fountain Boulevard) and Platte Avenue
- Widened Airport Road east and west of CO 21 to complete a four-lane roadway, from the west side to the entrance of Peterson Air Force Base
- Added turn lanes to the CO 21/Airport Road intersection
- Added a noise wall on the west side of CO 21 and south of Airport Road
Photos
These images show the installation of the sound wall along the west side of Powers Boulevard, south of Airport Road. A total of 174 panels will be placed. As of Aug. 16, 2016 25 percent of the panels had been installed.
Peterson Air Force Base West Gate Closure
From at 8 p.m. Friday, July 29 to 5 a.m. Monday, Aug. 1, crews will close the left lanes of northbound and southbound Airport Road, just off Powers Boulevard. The closures are necessary so crews can widen the intersection and relocate signal lights. During the closures, drivers are encouraged to take an alternate route. All POV traffic will be diverted to the North Gate (Peterson Boulevard/Highway 24) with any overflow to East Gate, off of Marksheffel Road. All commercial traffic must use East Gate during this time.