CO 96 Arkansas River to US 50B and CO 47 from US 50B to Pete Jimenez Boulevard
Project complete
About the Project
Crews on this project will be improving numerous intersections, replacing signals, resurfacing the road and upgrading a bridge.
Project benefits include:
- better surface quality.
- upgraded guardrails.
- enhanced safety through striping and signing.
- extended life of the bridge.
- safer crossings for pedestrians.
- upgraded ADA ramps to meet current standards.
While project hours have not yet been determined, work is scheduled to be completed from July 2016 through 2018.
Project Facts
- Cost:
$10 million
Project Team
- Contractor(s): TBD