Keywords: Studies, Interstates
Completed Studies
Region 3 of the Colorado Department of Transportation (CDOT) and Mesa County have identified a need to improve future traffic operations on US 6 between the I-70 Business Loop and the railroad viaduct east of 33 Road by developing an access management plan (AMP) . This ACP evaluated the portion of the US 6 corridor located from the Interstate 70 (I-70) Business Loop to the viaduct over the Union Pacific Railroad east of 33 Road. Keywords: Studies, US Highways, Access Control Plan
The proposed project is located in La Plata County, Colorado. The project length on US 160 would be 16.2 miles, extending from milepost (MP) 88.0, located east of Durango , to MP 104.2, located east of Bayfield. The project length on US 550 would be 1.2 miles, extending from MP 16.6, located at the US 160/US 550 (south) intersection, to MP 15.4, located south of the US 550/County Road (CR) 220 intersection. Keywords: Studies, US Highways
Studies, US Highways, State Highways
Study complete
Study complete
Study completed
Study completed
Study complete
Study complete
Project completed
Study completed
Study Completed
Study completed
Study completed
Study complete
Study complete
Study complete
