US 160 East of Durango Phase 2
Project Complete
About the Project
Constructs a new eastbound on-ramp as part of an already scheduled project that will widen US 160 to four lanes and relocate a traffic signal due to the widening.
Project Facts
- Construction Cost: $4 million (ARRA Funds: $3.9 million)
- Contractor: SEMA Construction, Inc.
- Timeline: September 2009 to September 2010
- Location: Highway(s) and specific location
- County: La Plata