Construction Complete, Colorado Highways
Archived Project Sites
Colorado Highways, CO 330 from intersection with CO 65 to the Town of Collbran Project description Work will consist of resurfacing the roadway by applying a 1.5” full-width hot asphalt overlay to the existing road surface, adding additional gravel to the shoulders, repairing and replacing guardrail, and restriping the roadway surface with 6” center and edge lines. Work will be done in both the eastbound and westbound lanes for the entire length of CO 330 from the intersection with CO 65 to the Town of Collbran, an 11.4-mile stretch.
Keywords: Construction Complete, State Highways
Colorado Highways
Keywords: Construction Complete
Colorado Highways, State Highways, Near the intersection of I-70 and CO 391 at Kipling and W. 48th Ave. interchange at mile points 9.2 - 9.6
State Highways, Colorado Highways
Design Phase
State Highways
Keywords: State Highways
Interstates
Resurfacing - Keywords: State Highways
Keywords: Construction Complete
Keywords: Construction Complete, State Highways
US Highways
