Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. American Recovery & Reinvestment Act
  4. Project Photos
  5. Region 5 -Southwest
Resources
  • Projects
  • Studies
  • Flood-Related Projects
  • FASTER
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • 2018 Public Meeting Presentation
  • ImprovementProjectLocations.jpg
  • cdot-travel-alerts.png
  • Assets
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe PEL | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Northeastern Colorado Bridge Rehabilitation in Boulder County
  • Teller County
  • El Paso County Bridge Maintenance
  • US 50 Bonforte to Avondale Resurfacing
  • About
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 287 Concrete Panel Replacement LaPorte
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • American Recovery & Reinvestment Act
    • Funding Allocation
    • Transit Allocation
    • Other ARRA Projects
    • ARRA Project List
    • STIP
    • Project Photos
      • Region 1 - Central Mountains/Eastern Plains
      • Region 2- South/Southeast
      • Region 3 - Northwest
      • Region 4 - North/Northeast
      • Region 5 -Southwest
        • US 24/US 285 near Johnson Village
        • State Highway 62 at Dallas Divide between Ridgway and Telluride
        • US 160 east of Durango
        • US 285 south of Saguache
        • US 160 at CR 222/223 east of Durango
        • US 160 at CR 222/223 east of Durango
        • US 160 between Shaw Creek and Del Norte
        • US 160, Alamosa east
        • US 24/US 285 near Johnson Village
        • US 24/US 285 near Johnson Village
        • State Highway 62 at Dallas Divide Between Ridgway and Telluride
        • State Highway 62 at Dallas Divide Between Ridgway and Telluride
        • CO 62 at Dallas Divide Between Ridgway and Telluride
        • State Highway 62 at Dallas Divide Between Ridgway and Telluride
        • US 160 east of Durango
        • US 285 south of Saguache
        • US 285 south of Saguache
        • US 160 between Shaw Creek and Del Norte
        • US 160 between Shaw Creek and Del Norte
        • US 160, Alamosa east
        • US 160, Alamosa east
        • US 160, Alamosa east
      • Region 6 - Denver metro
    • Contact Information
    • News Releases
    • ARRA Certifications
    • ARRA Projects
    • CDOT Owned ARRA Project Map
    • ARRA Savings Projects
    • Non-Competitively Bid Contracts
Region 5 -Southwest https://www.codot.gov/projects/arra/project-photos/R5-SW https://www.codot.gov/@@site-logo/siteLogo.png

Region 5 -Southwest

Before construction. thumbnail image US 24/US 285 near Johnson Village
Before construction. thumbnail image State Highway 62 at Dallas Divide between Ridgway and Telluride
Before construction. thumbnail image US 160 east of Durango
Before construction. thumbnail image US 285 south of Saguache
Before construction. thumbnail image US 160 at CR 222/223 east of Durango
Before construction. thumbnail image US 160 at CR 222/223 east of Durango
Before construction. thumbnail image US 160 between Shaw Creek and Del Norte
Before construction. thumbnail image US 160, Alamosa east
Crews pave US 24/US 285. thumbnail image US 24/US 285 near Johnson Village
Crews pave US 24/US 285 as flaggers direct traffic through the work zone. thumbnail image US 24/US 285 near Johnson Village
Crews replace guardrail along SH 62. thumbnail image State Highway 62 at Dallas Divide Between Ridgway and Telluride
Crews pave SH 62. thumbnail image State Highway 62 at Dallas Divide Between Ridgway and Telluride
Crews pave CO 62 while flaggers direct motorists through the work zone. thumbnail image CO 62 at Dallas Divide Between Ridgway and Telluride
After construction at milepost 15. thumbnail image State Highway 62 at Dallas Divide Between Ridgway and Telluride
Crews begin construction of the new eastbound on-ramp. thumbnail image US 160 east of Durango
US 285 after paving, nearing completion. thumbnail image US 285 south of Saguache
US 285 after paving, nearing completion. thumbnail image US 285 south of Saguache
Crews rotomill and pave US 160. thumbnail image US 160 between Shaw Creek and Del Norte
Crews rotomill and pave US 160. thumbnail image US 160 between Shaw Creek and Del Norte
After construction. thumbnail image US 160, Alamosa east
Crews prepare US 160 for asphalt paving. thumbnail image US 160, Alamosa east
Crews pave US 160. thumbnail image US 160, Alamosa east

Tags:
  • Images
  • Southwestern (Region 5)
  • ARRA
Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo