About the Project:

This project involves the replacement of three culverts on CO14 from MP 76 to MP 87. This will include: precast CBC, RCP, Grouted Boulder Basin, Erosion Control, Traffic Control, Asphalt Patching and Temporary Striping. This  projects improvements at the three existing culvert sites will allow water to flow unobstructed under the roadway and allow for safer travel.

This emergency culvert repair project is located in Larimer County on CO 14 at milepost 76 through milepost 86, west of Fort Collins.


Work Schedule

  • To be determined

Traffic Impacts

  • To be determined

Project Facts

  • Cost: $769,386
  • Contractor: Mountain Construction
  • Timeline: April - June 2022
  • Location: CO14 from MP 76 to MP 87, west of Fort Collins, Larimer County