Colorado Boulevard Resurfacing Project

Project Complete!

The Colorado Department of Transportation in cooperation with prime contractor Brannan Sand and Gravel, completed a resurfacing project in June on Colorado Boulevard (CO State Highway 2). The project zone stretches over two miles between Denver and Adams Counties from Martin Luther King Jr. Boulevard (Mile Point 7.44) to US Highway 6 (Mile Point 9.77). The scope of work included concrete curb ramp upgrades in nine locations, and a mill and overlay process to resurface the roadway. The project was completed in October, 2023.

Sunrise over a newly resurfaced section of Colorado Boulevard in August 2023
Sunrise over a newly resurfaced section of Colorado Boulevard in August 2023

Project Benefits

  • Creating smoother more enjoyable travel paths for all motorists.
  • Enhancing the safety and longevity of the roadway surface for the traveling public.
  • Providing greater accessibility with curb ramp upgrades in accordance with the Americans with Disabilities Act (ADA).

Project Facts

  • Construction Cost: $3,269,122
  • Contractor: Brannan Sand and Gravel
  • Timeline: June through October 2023
  • Location: CO 2 (Colorado Blvd.) from Martin Luther King Jr. Boulevard to US 6 
    • Nearest Town/City: Northbound from Denver and moving toward Commerce City
    • Mile Point(s): 7.47 to 9.50
    • County: Denver & Adams
Colorado Boulevard project Map
Colorado Boulevard Resurfacing project Map